Posts

weigh feeder belt patching

Image
Required tools 1. Grinder machine AG-4 with hot blower 2.310 solution 3. Wire brush Precautions:- Check expiry of solution and hardener before pasting job.

RAV inspection and pm job

Image
Following point to be observed while inspection of RAV 1.open the motor flange 2.Dismantle the gear box motor shaft covering with 2 nos of eccentric bearing RN 206 bearing and 1nos of 6304 bearing. Note   1.after installation all thing i.e gear box ,motor etc. Before electrical connection check the nde side of motor whether it is free rotating or not.  2. Bearing roller to be checked. 3. Check gasket fittings. Other pic during job

check point for weigh feeder when drop test fails

Weigh feeder checkpoints when drop test having error. 1. Alignment of carrying idler by line dori. 2. Check whether material stuck in C.I  3. Check plate which is connected to bunker.